Tailored Bali 5-Star Designer Hospitality Furniture Commission Hotel Bedroom Furniture Set Hotel Project Furniture with Design

Product Description

`
One-stop Turnkey Hospitality Furniture Solution Tailored Hotel Guest Room Furniture Custom Hotel Bedroom Furniture with Design
Key Words: "Hotel Furniture" "Hotel bedroom sets" "Hotel Bedroom Furniture" "Hospitality Furniture"
Hotel Bedroom Furniture Solution
Project capacity One-stop From A To Z Customization Service For Hotels/Resorts/Apartments/Villas
Design capacity Professional Design Team Can Provide CAD or 3D Drawings
Measurement Support Global Project Site Measurement
Installation On-Site Installation Service is Available
Project Cases Please Send an Inquiry to Request for Case Files
Certificate ISO 9001/ISO 14001/ISO45001/FSC/PEFC/CPSC/CE/UKCA/AS/NZS/ESMA/SGS/Intertek/TÜV/UL etc.
Click Send Inquiry for quotation and design plan
You will receive professional service and advice
Hotel Furniture Design 1
Hotel Furniture Design 2
Hotel Furniture Design 3
Hotel Furniture Design 4
Hotel Furniture Design 5
Hotel Furniture Design 6
Hotel Furniture Design 7
Hotel Furniture Design 8
Hotel Furniture Design 9
Hotel Furniture Design 10
Hotel Furniture Design 11
Hotel Furniture Design 12
Hotel Furniture Design 13
Hotel Furniture Design 14
Frequently Asked Questions
Q What products and services can you provide?
(1) We specially customize internationally famous 5-star hotel furniture, villa furniture, and high-end restaurant furniture, including fixed and loose furniture.
* Fixed furniture: wood paneling, decoration wall paneling, cabinets, wardrobes, doors & door frames, skirting, etc.
* Loose furniture: headboards, bed bases, bedside tables, bed benches, study tables, study chairs, TV cabinets, sofas, coffee tables, mini bars, luggage cabinets, etc.
(2) We also provide a one-stop service, allowing you to purchase lighting, curtains, carpets, artwork, hardware, and accessories together to save budget and time.
Q How long should I prepare to purchase furniture before the hotel opens?
It is recommended to order furniture 6 months before the hotel opens. The general timeline includes:
(1) Layout plans based on CAD & 3D (3-5 days); (2) Material & quantity confirmation (1-2 days); (3) Quotation (1-7 days); (4) Small samples check (3-5 days); (5) Production drawings after 40% deposit (3-15 days); (6) Drawing approval (3-5 days); (7) Production (60 days); (8) Quality control (1-3 days); (9) Packing and loading (3-5 days); (10) Delivery (30-60 days); (11) Installation (15-30 days); (12) After-sale service and cleaning (10-15 days).
Q What materials do you use, and how do you control product quality?
* Base material: E1 grade plywood / B1 grade fireproof plywood.
* Surfacing: Natural veneer / Solid color paint / Brand HPL laminate / PET.
* Solid wood: Imported ash solid wood.
* Paint: World-renowned brand painting.
* Foam: High density foam ≥45KG/m³.
* Fabric/Leather: High quality cotton, linen, lint, real cowhide leather, microfiber leather, or PU leather.
* Stone/Metal: Natural/Artificial marble, Quartz, #316/304/201 Stainless Steel, iron, aluminum.
* Hardware: DTC, Archie, Blum, Hettich, Hafele.
In addition to premium materials, we have a 10-person QC team, with the CEO leading managers to inspect product details one by one, ensuring 100% quality control.
Q Will you customize products according to our design plan, size, and material specifications?
Yes, we provide 100% customization service according to clients' requirements and specifications. We will adjust every detail until you are fully satisfied. Every client enjoys a unique customization experience with a dedicated team and a project manager available 24/7.
Q Can you assist with on-site installation?
Regarding installation, we offer the following solutions:
1. For movable furniture and simple assemblies, we provide detailed installation videos, instructions, and real-time video call support.
2. For fixed paneling, cabinets, and doors, we can send designers to guide the installation on-site and train local workers.
3. For urgent project timelines, we can send an installation team to complete the installation of the entire hotel.
* Note: The client is responsible for round-trip air tickets, board, lodging, and wages of the technicians. Installation fees are calculated additionally.
Q What is your after-sales service and warranty?
Our after-sales service helps resolve emergencies such as damage or shortages, with minor issues resolved within 3-5 days. Our warranty period is 3 years, and the furniture is built to last for more than 10 years.

Related Products